Khurja Super Thermal Power Project

S. No. Title Event Date
1 THDCIL Launches ‘Mission Shakti-2026’ to Promote Girl Child Empowerment and Holistic Development
2 1000th Coal Rake Received at KSTPP
3 Director (Technical), THDCIL, visit at KSTPP, Khurja on 09.05.2025
4 Turbine Barring Gear for Unit#2 achieved at Khurja Super Thermal Power Project
5 Locomotive rolling from Danwar station to THDC yard conducted successfully
6 Boiler Light Up at KSTPP, Khurja: A Milestone Achievement
7 Boiler Light Up at KSTPP, Khurja: A Milestone Achievement
8 Shri Pankaj Agarwal, Secretary (Power), MoP, Shri Praveen Gupta, Member (Thermal), CEA and Shri Piyush Singh, Joint Secretary (Thermal)on official visit to review the progress of the 1320 MW Khurja Super Thermal Power Project (STPP)
9 Commissioning of Main DM Water Production Plant and Cooling Water Pump at KSTPP, Khurja
10 Significant project milestones achieved at KSTPP, Khurja
11 Raw Water Pumps become operational at KSTPP, Khurja
12 THDC India Limited, Premier Power Sector PSU gears up for the issuance of Corporate Bond Series-IX
13 THDC India Limited, Premier Power Sector PSU gears up for the issuance of Corporate Bond Series-IX
14 Turbine Box Up: Khurja STPP(2X660MW)
15 Charging of Station Transformer # 1: Khurja STPP(2X660MW)
16 Commencement of Turbine Generator Erection Unit#1 at Khurja STPP
17 Khurja STPP: Construction attained a juncture with commencement of Ceiling Girder of Unit
18 TG Deck Casting: One more milestone caved of Khurja S.T.P.P.