| 61 |
Corrigendum 4- 220kV AIS Substation Package for construction of two Pooling substations (PSS1 & PSS2) of 33/220 kV capacity and 220 kV transmission lines up to 220kV side (incomer) of 220/400 kV Grid Sub-station (GSS) to evacuate power from 500MW & 300MW |
Download (269.75 KB) |
| 62 |
Renovation of Internal Electrification 20 No. C-Type Quarters at B. Puram |
Download (369.17 KB) |
| 63 |
In-situ repair work of 2 Nos of Turbine Runners of Tehri HPP. |
Download (382.11 KB) |
| 64 |
Civil repairing work of floor and approach road at Jurasi Nala pumping station under KHEP water supply scheme |
Download (345.4 KB) |
| 65 |
Corrigendum 5- Design, engineering, manufacture, testing at manufacturer’s works, supply, transportation, unloading and delivery at site including insurance & storage, erection, testing and commissioning of 33/220kV Power Transformer |
Download (205.35 KB) |
| 66 |
Corrigendum 3- 220kV AIS Substation Package for construction of two Pooling substations (PSS1 & PSS2) of 33/220 kV capacity and 220 kV transmission lines up to 220kV side (incomer) of 220/400 kV Grid Sub-station (GSS) to evacuate power from 500MW & 300MW |
Download (823.92 KB) |
| 67 |
Corrigendum 2- 220kV AIS Substation Package for construction of two Pooling substations (PSS1 & PSS2) of 33/220 kV capacity and 220 kV transmission lines up to 220kV side (incomer) of 220/400 kV Grid Sub-station (GSS) to evacuate power from 500MW & 300MW |
Download (276.98 KB) |
| 68 |
Corrigendum 1- 220kV AIS Substation Package for construction of two Pooling substations (PSS1 & PSS2) of 33/220 kV capacity and 220 kV transmission lines up to 220kV side (incomer) of 220/400 kV Grid Sub-station (GSS) to evacuate power from 500MW & 300MW |
Download (200.02 KB) |
| 69 |
Annual Repair and Maintenance of Residential and office Buildings at Alaknandapuram, VPHEP. |
Download (618.1 KB) |
| 70 |
Renovation of Internal Electrification 20 No. C-Type Quarters at B. Puram (Tender ID: 2025_THDC_856168_1) |
Download (1.25 MB) |