| 101 |
Construction of Sewer line and soak pits at Bhaintogi Nala Bhagirathipuram, Tehri. |
Download (1.04 MB) |
| 102 |
Annual maintenance work of B. Puram -zero bridge to Tipri road between Ch 251.150 to 261.00 Km at HPP, Tehri |
Download (766.04 KB) |
| 103 |
Epoxy painting of HRT Intake Stoplog gates and Draft Tube gates at Tehri HPP. |
Download (761.24 KB) |
| 104 |
Dismantling & Laying of HT & LT Cable from Old Sub Station-I to New Sub Station-I at THDCIL Complex, Rishikesh. |
Download (306.59 KB) |
| 105 |
Treatment of Dumped Muck area near Chopra village as per EIA-EMP report at Tehri. |
Download (762.83 KB) |
| 106 |
Repairing/Retubing of Lower Guide Bearing (LGB) Oil Coolers of Generating units of Tehri-HPP (4X250MW) |
Download (911.54 KB) |
| 107 |
Grit blasting and epoxy painting of Vertical Penstock liner of unit 4 at Tehri HPP |
Download (898.1 KB) |
| 108 |
Corrigendum 10 - 220kV AIS Sub-station Package for construction of 2 Nos. Pooling S/S (PSS1 and PSS2) of 33/220 kV capacity and 220 kV transmission lines up to 220kV side (incomer) of 220/400/765 kV Grid Sub-station (GSS) to evacuate power from each 300MW |
Download (126.42 KB) |
| 109 |
Supply and Laying of OFC (From Admin building IT department server room to view point top terrace, Khandkhala to QC department Koti and Dam Top to view point CISF gate) at THDCIL Tehri. |
Download (1.05 MB) |
| 110 |
Corrigendum 9 - 220kV AIS Sub-station Package for construction of 2 Nos. Pooling S/S (PSS1 and PSS2) of 33/220 kV capacity and 220 kV transmission lines up to 220kV side (incomer) of 220/400/765 kV Grid Sub-station (GSS) to evacuate power from each 300MW |
Download (200.56 KB) |