S.No. Title Download
41 Miscellaneous Civil works for Temporary Tin shed at Koti Dumpyard Download (414.39 किलोबाइट)
42 Balance work of Geological and Geotechnical Investigations of Kalai-II HEP (1200 MW) HEP Download (141.12 किलोबाइट)
43 Replacement of damaged equipment installed on the 33kV lines between the 220 kV power substation, Chamba and the 33/11 kV power substation, Bhagirathipuram under the project area, Tehri and Painting work on the electrical poles Download (613.17 किलोबाइट)
44 Strengthening of Bituminous Approach Road work of THDC Institute of Hydro Engg. College at B.puram, Tehri Download (1.29 मेगा बाइट)
45 Manufacturing, supply, fabricating and erection of steel structure for lowering and lifting of penstock inspection device in manhole of vertical penstock liner unit-1&2 at Tehri HPP. Download (583.66 किलोबाइट)
46 Installation and operation of submersible pump sets for dewatering of stilling basin of chute spillway Download (1.16 मेगा बाइट)
47 Installation of digital/glowing signage /hoarding at Tehri HPP (Dam Top), Tehri and repair of 02 No. Backlit board Download (786.55 किलोबाइट)
48 Engagement of consultant for obtaining Enviroment Clearance (EC) from the MoEF&CC for Morawadi-Majarewadi PSP (690 MW)- Maharashtra Download (71.98 किलोबाइट)
49 Engagement of consultant for obtaining Enviroment Clearance (EC) from the MoEF&CC for Aruna-Kolamb PSP (1200 MW)- Maharashtra Download (625.63 किलोबाइट)
50 Corrigendum 6- 220kV AIS Substation Package for construction of two Pooling substations (PSS1 & PSS2) of 33/220 kV capacity and 220 kV transmission lines up to 220kV side (incomer) of 220/400 kV Grid Sub-station (GSS) to evacuate power from 500MW & 300MW Download (279.53 किलोबाइट)