| 31 |
O and M of 1.00 MLD Sewerage Treatment Plant at THDCIL Rishikesh. |
Download (796.01 किलोबाइट) |
| 32 |
Corrigendum 1- Balance work of Geological and Geotechnical Investigations of Kalai-II HEP (1200 MW) HEP |
Download (246.27 किलोबाइट) |
| 33 |
Outer side repair painting Miscellaneous Civil works in Type IV (P-III) Quarter at B.Puram |
Download (393.92 किलोबाइट) |
| 34 |
Miscellaneous Civil works for Temporary Tin shed at Koti Dumpyard |
Download (414.39 किलोबाइट) |
| 35 |
Balance work of Geological and Geotechnical Investigations of Kalai-II HEP (1200 MW) HEP |
Download (141.12 किलोबाइट) |
| 36 |
Replacement of damaged equipment installed on the 33kV lines between the 220 kV power substation, Chamba and the 33/11 kV power substation, Bhagirathipuram under the project area, Tehri and Painting work on the electrical poles |
Download (613.17 किलोबाइट) |
| 37 |
Strengthening of Bituminous Approach Road work of THDC Institute of Hydro Engg. College at B.puram, Tehri |
Download (1.29 मेगा बाइट) |
| 38 |
Manufacturing, supply, fabricating and erection of steel structure for lowering and lifting of penstock inspection device in manhole of vertical penstock liner unit-1&2 at Tehri HPP. |
Download (583.66 किलोबाइट) |
| 39 |
Installation and operation of submersible pump sets for dewatering of stilling basin of chute spillway |
Download (1.16 मेगा बाइट) |
| 40 |
Installation of digital/glowing signage /hoarding at Tehri HPP (Dam Top), Tehri and repair of 02 No. Backlit board |
Download (786.55 किलोबाइट) |