S. No. Title
141 Excellence Unveiled: VPHEP Laboratory Celebrates 7 Years of EQAS Awardee Status, attains an Excellent (A grade) rating for all clinical chemistry tests
142 Sh. R. K. Vishnoi, CMD, THDCIL Reviews Nation's First 1000 MW Variable Speed Pumped Storage Project at Tehri
143 Raw Water Pumps become operational at KSTPP, Khurja
144 THDC India Limited, Premier Power Sector PSU gears up for the issuance of Corporate Bond Series-IX
145 Director (Technical) Visited KSTPP
146 Landmark Milestone by THDC India Limited towards commissioning of 2400 MW Tehri Power Complex
147 National Commission for SC Member Lauds THDCIL for Satisfactory Implementation of Reservation Policy
148 THDC India Limited Inks MOA for the Implementation of 1200 MW Kalai-II HEP with Govt of Arunachal Pradesh
149 In Landmark achievement THDC successfully Boxed up the Second Unit of 1000 MW Tehri PSP
150 In Landmark achievement THDC successfully Boxed up the Second Unit of 1000 MW Tehri PSP
151 External Power Evacuation System for 600MW Lalitpur Solar Power Project
152 Turbine Box Up: Khurja STPP(2X660MW)
153 Charging of Station Transformer # 1: Khurja STPP(2X660MW)
154 Award of the work of Internal Power Evacuation System to POWERGRID (PGCIL) for 600 MW Jhansi Solar Power Project
155 Loan Agreement with REC Ltd. for Development of 600 MW Ultra Mega Jhansi Solar Power Park
156 Innovation Reward and Swift decision making reward winner-2023
157 टीएचडीसीआईएल ने केरल राज्य बिजली बोर्ड लिमिटेड (केएसईबी) के साथ 11 अगस्त, 2022 को टीएचडीसी आईएल की पहल50 मेगावाट सौर ऊर्जा परियोजना, कासरगोड का बिजली खरीद समझौते (पीपीए) पर हस्ताक्षर किए
158 Commencement of Turbine Generator Erection Unit#1 at Khurja STPP
159 Consultative Committee of Ministry of Power held a meeting at THDC India Limited, Tehri on the theme “The Need for Enhancing Hydro-Capacity”
160 THDCIL signed MoU with RRECL for establishment of Renewable Energy Parks/Projects of 10,000 MWin Rajasthan