| 121 |
Establishment of Phase–II nd Inflow Forecasting System for Tehri Dam |
Download (1.01 मेगा बाइट) |
| 122 |
Annual Maintenance of Residential Building Upper Zone at B. Puram, Tehri |
Download (933.45 किलोबाइट) |
| 123 |
Treatment of Dumped Muck area near Chopra village as per EIA-EMP report at Tehri |
Download (932.12 किलोबाइट) |
| 124 |
Fencing with RCC Post at different Areas of affected villages as per Collateral Damage policy |
Download (812.19 किलोबाइट) |
| 125 |
Application for Empanelment of experienced and capable Contractors for EPC of floating Solar Project with subsequent O&M for 10 years across Pan India |
Download (597.69 किलोबाइट) |
| 126 |
Empanelment of Land Aggregators/ Facilitators for Acquisition of Land (On Lease/ Purchase Basis) for development of Ultra Mega Renewable Energy Power Parks (UMREPP) in Rajasthan under MNRE's Solar Park Scheme |
Download (326.33 किलोबाइट) |
| 127 |
Empanelment of Technical Consulting Agencies & award of work for Preparation of Feasibility Report of Floating Solar Power Projects at various locations. |
Download (117.57 किलोबाइट) |
| 128 |
Empanelment of Technical Consulting Agencies & award of work for Preparation of Feasibility Report of Ground Mounted and Rooftop Solar Power Projects at various locations across PAN India for Three (3) Years. |
Download (148.68 किलोबाइट) |
| 129 |
Supply and installation of CCTV cameras in interface building at Power House |
Download (931.48 किलोबाइट) |
| 130 |
Annual Sweeping & Cleaning of Residential Area at Koti Colony |
Download (929.74 किलोबाइट) |