| 91 |
Supply of 6 Nos. X 33/220kV Power Transformer with Rated Capacity of 100MVA for Pooling substations (Namely PSS1 & PSS2) at 600 MW Solar Park Project at Talbehat, Lalitpur (U.P.) |
Download (176.49 किलोबाइट) |
| 92 |
Design, Engineering, Supply, Installation, Testing, Commissioning, Operation and Maintenance of 20 TPD Carbon Capture and Utilization (CCU) Plant under the BOOT (Build, Own, Operate & Transfer) model at Khurja STPP (2X660 MW) |
Download (672.74 किलोबाइट) |
| 93 |
In-situ repair work of 2 Nos of Turbine Runners of Tehri HPP. |
Download (1.12 मेगा बाइट) |
| 94 |
Construction of Sewer line and soak pits at Bhaintogi Nala Bhagirathipuram, Tehri. |
Download (1.04 मेगा बाइट) |
| 95 |
Annual maintenance work of B. Puram -zero bridge to Tipri road between Ch 251.150 to 261.00 Km at HPP, Tehri |
Download (766.04 किलोबाइट) |
| 96 |
Epoxy painting of HRT Intake Stoplog gates and Draft Tube gates at Tehri HPP. |
Download (761.24 किलोबाइट) |
| 97 |
Dismantling & Laying of HT & LT Cable from Old Sub Station-I to New Sub Station-I at THDCIL Complex, Rishikesh. |
Download (306.59 किलोबाइट) |
| 98 |
Treatment of Dumped Muck area near Chopra village as per EIA-EMP report at Tehri. |
Download (762.83 किलोबाइट) |
| 99 |
Repairing/Retubing of Lower Guide Bearing (LGB) Oil Coolers of Generating units of Tehri-HPP (4X250MW) |
Download (911.54 किलोबाइट) |
| 100 |
Grit blasting and epoxy painting of Vertical Penstock liner of unit 4 at Tehri HPP |