विद्द्युत उत्पादन हमारी कटिबद्धता... समाज का विकास हमारी प्रतिबद्धता...
Corrigendum 4- 220kV AIS Substation Package for construction of two Pooling substations (PSS1 & PSS2) of 33/220 kV capacity and 220 kV transmission lines up to 220kV side (incomer) of 220/400 kV Grid Sub-station (GSS) to evacuate power from 500MW & 300MW