| 41 |
Miscellaneous Civil works for Temporary Tin shed at Koti Dumpyard |
Download (414.39 किलोबाइट) |
| 42 |
Balance work of Geological and Geotechnical Investigations of Kalai-II HEP (1200 MW) HEP |
Download (141.12 किलोबाइट) |
| 43 |
Replacement of damaged equipment installed on the 33kV lines between the 220 kV power substation, Chamba and the 33/11 kV power substation, Bhagirathipuram under the project area, Tehri and Painting work on the electrical poles |
Download (613.17 किलोबाइट) |
| 44 |
Strengthening of Bituminous Approach Road work of THDC Institute of Hydro Engg. College at B.puram, Tehri |
Download (1.29 मेगा बाइट) |
| 45 |
Manufacturing, supply, fabricating and erection of steel structure for lowering and lifting of penstock inspection device in manhole of vertical penstock liner unit-1&2 at Tehri HPP. |
Download (583.66 किलोबाइट) |
| 46 |
Installation and operation of submersible pump sets for dewatering of stilling basin of chute spillway |
Download (1.16 मेगा बाइट) |
| 47 |
Installation of digital/glowing signage /hoarding at Tehri HPP (Dam Top), Tehri and repair of 02 No. Backlit board |
Download (786.55 किलोबाइट) |
| 48 |
Engagement of consultant for obtaining Enviroment Clearance (EC) from the MoEF&CC for Morawadi-Majarewadi PSP (690 MW)- Maharashtra |
Download (71.98 किलोबाइट) |
| 49 |
Engagement of consultant for obtaining Enviroment Clearance (EC) from the MoEF&CC for Aruna-Kolamb PSP (1200 MW)- Maharashtra |
Download (625.63 किलोबाइट) |
| 50 |
Corrigendum 6- 220kV AIS Substation Package for construction of two Pooling substations (PSS1 & PSS2) of 33/220 kV capacity and 220 kV transmission lines up to 220kV side (incomer) of 220/400 kV Grid Sub-station (GSS) to evacuate power from 500MW & 300MW |
Download (279.53 किलोबाइट) |