| 71 |
Corrigendum 4- Supply of 6 Nos. X 33/220kV Power Transformer with Rated Capacity of 100MVA for Pooling substations (Namely PSS1 & PSS2) at 600 MW Solar Park Project at Talbehat, Lalitpur (U.P.) |
Download (201.1 KB) |
| 72 |
Engagement of Consultant for Preparation of Detail Project Report (DPR) of ARUNA- KOLAMB PSP 1200 MW, Maharashtra |
Download (289.88 KB) |
| 73 |
Annual Cleaning and Maintenance of School Buses, Workshop, Vehicles and HEM Equipment of Project Services Deptt., Tehri. |
Download (768.62 KB) |
| 74 |
Work of Operation and Daily Routine Maintenance of Water Treatment Plant (WTP) and Sewage Treatment Plant (STP) at Power House Building, KHEP |
Download (775.7 KB) |
| 75 |
Engagement of Consultant for “Preparation of Detail Project Report (DPR) of Humbarli Birmani (1000 MW) PSP, Maharashtra”- (Tender No. THDCIL/NCR/CC-529) |
Download (287.05 KB) |
| 76 |
220kV AIS Substation Package for construction of two Pooling substations (PSS1 & PSS2) of 33/220 kV capacity and 220 kV transmission lines up to 220kV side (incomer) of 220/400 kV Grid Sub-station (GSS) |
Download (1.1 MB) |
| 77 |
Corrigendum 2- Design, engineering, manufacture, testing at manufacturer’s works, supply, transportation, unloading and delivery at site including insurance & storage, erection, testing and commissioning of 33/220kV Power Transformer |
Download (471.22 KB) |
| 78 |
Corrigendum 1- Design, engineering, manufacture, testing at manufacturer’s works, supply, transportation, unloading and delivery at site including insurance & storage, erection, testing and commissioning of 33/220kV Power Transformer |
Download (122.99 KB) |
| 79 |
Corrigendum 3- Supply of 6 Nos. X 33/220kV Power Transformer with Rated Capacity of 100MVA for Pooling substations (Namely PSS1 & PSS2) at 600 MW Solar Park Project at Talbehat, Lalitpur (U.P.) |
Download (12.45 KB) |
| 80 |
Appointment of a Consultant for providing “Detailed Design & Engineering Consultancy services” for implementation of 1200MW Kalai-II HEP. |
Download (155.43 KB) |