| 61 |
Corrigendum 1- 220kV AIS Substation Package for construction of two Pooling substations (PSS1 & PSS2) of 33/220 kV capacity and 220 kV transmission lines up to 220kV side (incomer) of 220/400 kV Grid Sub-station (GSS) to evacuate power from 500MW & 300MW |
Download (200.02 KB) |
| 62 |
Annual Repair and Maintenance of Residential and office Buildings at Alaknandapuram, VPHEP. |
Download (618.1 KB) |
| 63 |
Renovation of Internal Electrification 20 No. C-Type Quarters at B. Puram (Tender ID: 2025_THDC_856168_1) |
Download (1.25 MB) |
| 64 |
Annual maintenance of Zero bridge to Koteshwar road in between Ch 0.00 to 17.00 Km at KHEP, Koteshwar (Tender ID: 2025_THDC_856259_1) |
Download (1.23 MB) |
| 65 |
Civil repairing work of floor and approach road at Jurasi Nala pumping station under KHEP water supply scheme (Tender ID: 2025_THDC_856273_1) |
Download (1.24 MB) |
| 66 |
Corrigendum 4- Design, engineering, manufacture, testing at manufacturer’s works, supply, transportation, unloading and delivery at site including insurance & storage, erection, testing and commissioning of 33/220kV Power Transformer |
Download (4.61 MB) |
| 67 |
Corrigendum 3- Design, engineering, manufacture, testing at manufacturer’s works, supply, transportation, unloading and delivery at site including insurance & storage, erection, testing and commissioning of 33/220kV Power Transformer |
Download (239.49 KB) |
| 68 |
Engagement of Consultant for Preparation of Detailed Project Report (DPR) of MORAWADI - MAJAREWADI PSP 690 MW, Maharashtra”- (Tender No. THDCIL/NCR/CC-532) |
Download (287.51 KB) |
| 69 |
Engagement of Consultant for preparation of DPR of Aruna (1950 MW) PSP, Maharashtra"(Tender No. THDCIL/NCR/CC-531) |
Download (363.36 KB) |
| 70 |
Corrigendum 5- Supply of 6 Nos. X 33/220kV Power Transformer with Rated Capacity of 100MVA for Pooling substations (Namely PSS1 & PSS2) at 600 MW Solar Park Project at Talbehat, Lalitpur (U.P.) |
Download (3.21 MB) |