S.No. Title Download
111 Corrigendum 8 - 220kV AIS Sub-station Package for construction of 2 Nos. Pooling S/S (PSS1 and PSS2) of 33/220 kV capacity and 220 kV transmission lines up to 220kV side (incomer) of 220/400/765 kV Grid Sub-station (GSS) to evacuate power from each 300MW Download (3.64 MB)
112 Corrigendum 7 - 220kV AIS Sub-station Package for construction of 2 Nos. Pooling S/S (PSS1 and PSS2) of 33/220 kV capacity and 220 kV transmission lines up to 220kV side (incomer) of 220/400/765 kV Grid Sub-station (GSS) to evacuate power from each 300MW Download (597.07 KB)
113 Corrigendum 6 - 220kV AIS Sub-station Package for construction of 2 Nos. Pooling S/S (PSS1 and PSS2) of 33/220 kV capacity and 220 kV transmission lines up to 220kV side (incomer) of 220/400/765 kV Grid Sub-station (GSS) to evacuate power from each 300MW Download (105.06 KB)
114 Corrigendum 5 - 220kV AIS Sub-station Package for construction of 2 Nos. Pooling S/S (PSS1 and PSS2) of 33/220 kV capacity and 220 kV transmission lines up to 220kV side (incomer) of 220/400/765 kV Grid Sub-station (GSS) to evacuate power from each 300MW Download (653.82 KB)
115 Corrigendum 4 - 220kV AIS Sub-station Package for construction of 2 Nos. Pooling S/S (PSS1 and PSS2) of 33/220 kV capacity and 220 kV transmission lines up to 220kV side (incomer) of 220/400/765 kV Grid Sub-station (GSS) to evacuate power from each 300MW Download (1.64 MB)
116 Renovation of Internal Electrification of Laundry/Driver hostel at Guest House B. Puram. Download (588.08 KB)
117 Corrigendum 3 - 220kV AIS Sub-station Package for construction of 2 Nos. Pooling S/S (PSS1 and PSS2) of 33/220 kV capacity and 220 kV transmission lines up to 220kV side (incomer) of 220/400/765 kV Grid Sub-station (GSS) to evacuate power from each 300MW Download (199.69 KB)
118 Corrigendum 2 - 220kV AIS Sub-station Package for construction of 2 Nos. Pooling S/S (PSS1 and PSS2) of 33/220 kV capacity and 220 kV transmission lines up to 220kV side (incomer) of 220/400/765 kV Grid Sub-station (GSS) to evacuate power from each 300MW Download (196.05 KB)
119 Corrigendum 1 - 220kV AIS Sub-station Package for construction of 2 Nos. Pooling S/S (PSS1 and PSS2) of 33/220 kV capacity and 220 kV transmission lines up to 220kV side (incomer) of 220/400/765 kV Grid Sub-station (GSS) to evacuate power from each 300MW Download (388.35 KB)
120 220kV AIS Substation Package for construction of two Pooling substations (PSS1 & PSS2) of 33/220 kV capacity and 220 kV transmission lines up to 220kV side (incomer) of 220/400/765 kV Grid Sub-station (GSS) to evacuate power from each 300MW capacity block Download (560.46 KB)