121 Another Milestone: Concrete Placement at Central Overflow Block 3 of VPHEP Commenced
122 "Fit India Freedom Run 5.0" Organized at VPHEP with the Message of 'Swachh Bharat, Swachh Bhojan'
123 Bhoomi Pujan Ceremony of Floating Solar Plant Conducted at KSTPP, Khurja
124 Celebration of National Blood Donation Day at TUSCO Limited
125 मुख्य सतर्कता अधिकारी ने किया खुर्जा परियोजना का दौरा
126 टीएचडीसी इंडिया लिमिटेड ने प्राप्त किया प्रथम राजभाषा कीर्ति पुरस्कार
127 THDCIL’s Vishnugad-Pipalkoti Hydro Electric Project Achieves Significant Milestone with Draft Tube Installation in Unit-I
128 Director (Technical) Visited KSTPP
129 Commissioning of EOT Crane in the Power House of the VPHEP Project
130 VPHEP Achieved Significant Milestone: Raft Concrete of Butterfly Valve Chamber Begins
131 International Labor Day celebrated in THDC's VPHEP project, medical check-up camp organized for workers
132 Locomotive rolling from Danwar station to THDC yard conducted successfully
133 Boiler Light Up at KSTPP, Khurja: A Milestone Achievement
134 Shri Pankaj Agarwal, Secretary (Power), MoP, Shri Praveen Gupta, Member (Thermal), CEA and Shri Piyush Singh, Joint Secretary (Thermal)on official visit to review the progress of the 1320 MW Khurja Super Thermal Power Project (STPP)
135 Commissioning of Main DM Water Production Plant and Cooling Water Pump at KSTPP, Khurja
136 THDCIL Bags SCOPE Meritorious Award for Best Practices in Human Resource Management
137 THDCIL dedicates India's Largest Electrolyser End Fuel Cell based Green Hydrogen Pilot Project at Rishikesh
138 External Power Evacuation System for 600MW Jhansi Solar Power Project
139 Significant project milestones achieved at KSTPP, Khurja
140 THDC Achieves Milestone with Commencement of Concrete Work on 444 MW Vishnugad-Pipalkoti Hydro Electric Project's Main Dam