Employee Login |
Erection & Comissioning of 50 MW wind Power Project at Patan |
thdcadmin |
1 year 11 months ago |
Employee Login |
Report on Commissioning Checks_Generator |
thdcadmin |
1 year 11 months ago |
Employee Login |
Oil leakage in GT1 by replacement of Bottom Rim Gasket at Tehri HEP |
thdcadmin |
1 year 11 months ago |
Employee Login |
Stabilization of Varunavat Pravat landslide |
thdcadmin |
1 year 11 months ago |
Employee Login |
Restoration of GT#3 HV Bushing of Tehri HPP |
thdcadmin |
1 year 11 months ago |
Employee Login |
Lifting of regulating ring of KHEP |
thdcadmin |
1 year 11 months ago |
Employee Login |
Hydrographical area drainage study of Khurja STPP(2X660 MW) |
thdcadmin |
1 year 11 months ago |
Employee Login |
Damage, root cause analysis and restoration of thrust pads_KHEP |
thdcadmin |
1 year 11 months ago |
Employee Login |
Quality control of spillways of Tehri |
thdcadmin |
1 year 11 months ago |
Employee Login |
Quality control aspects in tehri dam |
thdcadmin |
1 year 11 months ago |
Employee Login |
Interpretation of instrumentation data |
thdcadmin |
1 year 11 months ago |
Employee Login |
Slope stabilization on water intake |
thdcadmin |
1 year 11 months ago |
Employee Login |
Fault analysis GIS TEHRI |
thdcadmin |
1 year 11 months ago |
Employee Login |
Excavation of Koteshwar dam |
thdcadmin |
1 year 11 months ago |
Employee Login |
Counter claim |
thdcadmin |
1 year 11 months ago |
Employee Login |
Role of Tehri Dam prevention of Floodveling and centering |
thdcadmin |
1 year 11 months ago |
Employee Login |
Load sharing, leveling and centering of hydro machine |
thdcadmin |
1 year 11 months ago |
Employee Login |
Maintenance aspects of aging pipelines |
thdcadmin |
1 year 11 months ago |
Employee Login |
Neotectonics Studies |
thdcadmin |
1 year 11 months ago |
Employee Login |
Impact of reservoir on emission of Methane |
thdcadmin |
1 year 11 months ago |
Employee Login |
Problem Emergency slide valve at Koteshwar |
thdcadmin |
1 year 11 months ago |
Employee Login |
Financial and accounting issues in power sector |
thdcadmin |
1 year 11 months ago |
Employee Login |
Concreting in Koteshwar-1 |
thdcadmin |
1 year 11 months ago |
Employee Login |
Failure of stator winding at Koteshwar |
thdcadmin |
1 year 11 months ago |
Employee Login |
Earthing system design and calculation |
thdcadmin |
1 year 11 months ago |