Corrigendum 6- 220kV AIS Substation Package for construction of two Pooling substations (PSS1 & PSS2) of 33/220 kV capacity and 220 kV transmission lines up to 220kV side (incomer) of 220/400 kV Grid Sub-station (GSS) to evacuate power from 500MW & 300MW