Employee Login |
RTI ACT |
thdcadmin |
१ वर्ष 11 महिना पूर्व |
Employee Login |
Claims and Dispute Settlement |
thdcadmin |
१ वर्ष 11 महिना पूर्व |
Employee Login |
Turbine aeration system of Tehri HPP |
thdcadmin |
१ वर्ष 11 महिना पूर्व |
Employee Login |
Thermal Power Plants in new environment scenario |
thdcadmin |
१ वर्ष 11 महिना पूर्व |
Employee Login |
Specification and selection of Instrument transformer |
thdcadmin |
१ वर्ष 11 महिना पूर्व |
Employee Login |
Scientific cleaning of water storage tanks |
thdcadmin |
१ वर्ष 11 महिना पूर्व |
Employee Login |
Re-engineering the Financial Literacy to grow rich |
thdcadmin |
१ वर्ष 11 महिना पूर्व |
Employee Login |
Quality Aspects of the pump turbine runner of Tehri PSP |
thdcadmin |
१ वर्ष 11 महिना पूर्व |
Employee Login |
Overbreak in Underground Excavations Key insights |
thdcadmin |
१ वर्ष 11 महिना पूर्व |
Employee Login |
Negotiation-An effective tool in Public Procurement |
thdcadmin |
१ वर्ष 11 महिना पूर्व |
Employee Login |
Installation of indigenously developed rotor poles at Tehri HPP |
thdcadmin |
१ वर्ष 11 महिना पूर्व |
Employee Login |
CFD Analysis of Transient Flow Behavior in case of Pneumatic Conveying of Flash in 90 degree bend |
thdcadmin |
१ वर्ष 11 महिना पूर्व |
Employee Login |
Case Study on inhouse repairing of 11kV 433V 3 phase Dry type transformer at Tehri HPP |
thdcadmin |
१ वर्ष 11 महिना पूर्व |
Employee Login |
Case study Installation of Online Dryout System of Transformer at Tehri HPP |
thdcadmin |
१ वर्ष 11 महिना पूर्व |
Employee Login |
Alternative Methods for Design of Support System for Underground Power House Caverns of Jhelam Tamak HEP (108MW) DPR stage |
thdcadmin |
१ वर्ष 11 महिना पूर्व |
Employee Login |
Periodical Updation and Strengthening of Collaborative knowledge Desk |
thdcadmin |
१ वर्ष 11 महिना पूर्व |
Employee Login |
Case Study_Generator Fire Extinguishing System operation _Tehri HPP |
thdcadmin |
१ वर्ष 11 महिना पूर्व |
Employee Login |
Reverse power in Unit#4 - 17-02-2016_Tehri HPP |
thdcadmin |
१ वर्ष 11 महिना पूर्व |
Employee Login |
Jamming Tehri HPP-1 |
thdcadmin |
१ वर्ष 11 महिना पूर्व |
Employee Login |
ChemicalClecooling TEHRhpp |
thdcadmin |
१ वर्ष 11 महिना पूर्व |
Employee Login |
Case Study_installation of Online Dryout System of Transformer_Tehri HPP |
thdcadmin |
१ वर्ष 11 महिना पूर्व |
Employee Login |
Case Study_Generator Fire Extinguishing System operation _Tehri HPP |
thdcadmin |
१ वर्ष 11 महिना पूर्व |
Employee Login |
Report on Problem faced and remedial measures taken during erection and commissioning of KHEP and Tehri HPP EM HM 290118 |
thdcadmin |
१ वर्ष 11 महिना पूर्व |
Employee Login |
SPS at Tehri HPP for power evacuation through single circuit (KPS-Meerut) |
thdcadmin |
१ वर्ष 11 महिना पूर्व |
Employee Login |
Precommissioning & Commissioning of hydro turbine final |
thdcadmin |
१ वर्ष 11 महिना पूर्व |