प्रकार शीर्षक लेखक टिप्पणियाँ आखरी अपडेट
History Shri D. V. Singh thdcadmin 0 १ वर्ष 7 महिना पूर्व
History Shri R. S. T. Sai thdcadmin 0 १ वर्ष 7 महिना पूर्व
History Shri R. K. Sharma thdcadmin 0 १ वर्ष 7 महिना पूर्व
History Shri K. L. Zutshi thdcadmin 0 १ वर्ष 7 महिना पूर्व
Photo Gallery Khurja-Chimney-2 Shell casting in progress thdcadmin 0 १ वर्ष 7 महिना पूर्व
Photo Gallery Khurja-Cooling Tower-1 Hot Water Piping work in progress thdcadmin 0 १ वर्ष 7 महिना पूर्व
Photo Gallery Khurja-Railway Siding- Rail Laying inside Project Area in Progress thdcadmin 0 १ वर्ष 7 महिना पूर्व
Photo Gallery Khurja-Make up Water works-Erection of Gate lifting arrangements in cross regulator is under progress thdcadmin 0 १ वर्ष 7 महिना पूर्व
Photo Gallery Khurja-NH-91 has been diverted thdcadmin 0 १ वर्ष 7 महिना पूर्व
Photo Gallery Tehri PSP-Lower of MIV in pit(Unit-1) thdcadmin 0 १ वर्ष 7 महिना पूर्व
Photo Gallery Tehri PSP-After lowering of rotor Unit-1 thdcadmin 0 १ वर्ष 7 महिना पूर्व
Photo Gallery Amelia-Surface Miner deployed at site thdcadmin 0 १ वर्ष 7 महिना पूर्व
Photo Gallery Amelia-Dismantling of houses in progress thdcadmin 0 १ वर्ष 7 महिना पूर्व
Photo Gallery Amelia-Construction of Houses started by PAFs in R&R Colony thdcadmin 0 १ वर्ष 7 महिना पूर्व
Photo Gallery Amelia-Coal seam exposed thdcadmin 0 १ वर्ष 7 महिना पूर्व
Photo Gallery Khurja-ST-1 OIl Filling done, Ready for Charging thdcadmin 0 १ वर्ष 7 महिना पूर्व
Photo Gallery Khurja-Switchyard work nearing to completion thdcadmin 0 १ वर्ष 7 महिना पूर्व
Photo Gallery Khurja-Stacker Reclaimer-1equipment erection in progress thdcadmin 0 १ वर्ष 7 महिना पूर्व
Photo Gallery Khurja-Containerized DM Plant Ready for BHT of Boiler-1 thdcadmin 0 १ वर्ष 7 महिना पूर्व
Photo Gallery Khurja-Cooling Tower-1 FRP erection completed thdcadmin 0 १ वर्ष 7 महिना पूर्व
Photo Gallery VPHEP-TBM advancement along with concrete cradle casting in progress thdcadmin 0 १ वर्ष 7 महिना पूर्व
Photo Gallery VPHEP-Concrete Lining in DC – 1 (U/s) in progress thdcadmin 0 १ वर्ष 7 महिना पूर्व
Photo Gallery VPHEP-Excavation of TRT from Outlet in progress thdcadmin 0 १ वर्ष 7 महिना पूर्व
Photo Gallery VPHEP-Excavation of Dam Right bank thdcadmin 0 १ वर्ष 7 महिना पूर्व
Photo Gallery Khurja-Unit-1 IP Turbine Bottom Casing placed thdcadmin 0 १ वर्ष 7 महिना पूर्व