The wind power project of THDC India Limited at Patan Wind farm, Distt. Patan, Gujarat having an installed capacity of 50 MW comprises of 25 nos. Wind Turbine Generators (WTGs), each of 2 MW capacity. These 25 WTGs, installed in four villages namely Amrapur, Ved, Vahedpura and Anwarpura of distt. Patan, Gujarat are approximately 200 kms. from Ahmadabad and 120 kms. from Mehsana.

Commissioning of Project : The Project got commissioned on 29.06.2016, ahead of the schedule. The expected Annual generation from the project is 110.5 MU with 25.22% capacity factor. The Power Purchase Agreement (PPA) for the project has been signed with Gujarat Urja Vikas Nigam Limited (GUVNL) at a fixed tariff of Rs. 4.15 / unit for 25 years.

The project has been registered with IREDA for availing Generation Based Incentive (GBI) @ Rs. 0.50 / kWh with a cap of 1 Crore per MW. The project is entitled to receive a total GBI of 50 Crores under this scheme of Ministry of New & Renewable Energy.

The project has generated the total energy of 717.83 MU as on 31st October'2024 since the commissioning of project.

The main characteristics of WTGs installed at the project are:

S. No. Particulars  
1. Name of Site / Distt. / State Patan Wind farm
2. Project Capacity (MW) 50MW
3. WTG Model Gamesa G 97
a WTG rating (kW) 2000 kW
b Hub Height (Mtr.) 90 M
c Rotor Diameter (Mtr.) 97M
4. Type of Land Revenue
5. Pooling Sub-Station near Wind farm Existing 220/33KV SS at Amarapur
6. Grid Sub-Station Tharad approx 90 Kms. from PSS.