OUR ESTEEMED CLIENTS
(I) FOR COMPLETED CONSULTANCY SERVICES
- In-house consultancy from concept to commissioning of 1000 MW Tehri Hydro Electric Project including Detailed Engineering Designs.
- In-house Consultancy from Concept to Commissioning of 400 MW Koteshwar Hydro Electric Project including Detailed Engineering Designs.
- In-house Consultancy for 1000 MW Tehri Pumped Storage Project including Detailed Engineering Designs.
- Feasibility Report and Detailed Project Report of Vishnugad – Pipalkoti Hydro Electric Project (444 MW).
- Updation of Detailed Project Report of Sankosh Hydro Electric Project (2585 MW), Bhutan.
- Updation of Detailed Project Report of Bunakha Hydro Electric Project (180 MW), Bhutan.
- Updation of Detailed Project Report of Dhukwan Small Hydro Electric Project (24 MW), Jhansi (UP).
- Updation of Detailed Project Report of Malshej Ghat Pumped Storage Project (700 MW), Govt. of Maharashtra.
- Stabilization works of Varunavat Parvat landslide in Uttarkashi, Uttrakhand, Govt. of Uttarakhand.
- Pre-Feasibility Report for Pumped Storage Scheme in existing Upper Indravati Hydro Electric Project (600 MW) assigned by Odisha Hydro Power Corporation Ltd.
- Pre-Feasibility Report for Pumped Storage Scheme in existing Upper Kolab Hydro Electric Project (320 MW) assigned by Odisha Hydro Power Corporation Ltd.
- Pre-Feasibility Report for Pumped Storage Scheme in existing Balimela Hydro Electric Project (510 MW) assigned by Odisha Hydro Power corporation Ltd.
- Feasibility Report on Hydro power Potential of Indravati River based on Integrated basin concept assigned by Chhattisgarh State Power Generation Company Ltd.(CSPGCL).
- Stabilization of Vulnerable zones around the Holy Cave of Shri Amarnathji Shrine.
(II) FOR ON GOING CONSULTANCY SERVICES
- Detailed Project Report of Jhelum Tamak Hydro Electric Project (87 MW), Uttarakhand.
- Detailed Project Report of Bokang Bailing Hydro Electric Project (200 MW), Uttarakhand.
- Power Potential and E&M studies of power houses proposed under Damanganga-pinjal link project assigned by National Water Development Agency (NWDA).
Updated on : 27/05/2020