Assignment Details

Completed Assignments:
  • Updation of Detailed Project Report of Sankosh Hydro Electric Project (2585 MW), Bhutan.
  • Updation of Detailed Project Report of Bunakha Hydro Electric Project (180 MW), Bhutan.
  • Updation of Detailed Project Report of Dhukwan Small Hydro Electric Project (24 MW), Jhansi (UP).
  • Updation of Detailed Project Report of MalshejGhat Pumped Storage Project (700 MW), Govt. of Maharashtra.
  • Stabilization works of VarunavatParvat landslide in Uttarkashi, Uttarakhand, Govt. of Uttarakhand.
  • Pre-Feasibility Report for Pumped Storage Scheme in existing Upper Indravati Hydro Electric Project (600 MW) assigned by Odisha Hydro Power Corporation Ltd.
  • Pre-Feasibility Report for Pumped Storage Scheme in existing Upper Kolab Hydro Electric Project (320 MW) assigned by Odisha Hydro Power Corporation Ltd.
  • Pre-Feasibility Report for Pumped Storage Scheme in existing Balimela Hydro Electric Project (510 MW) assigned by Odisha Hydro Power corporation Ltd.
  • Feasibility Report on Hydro potential of Indravati River Basin based on an integrated Basin Concept.
On-going Consultancy Assignments in Hydro-Power:
  • Detailed Project Report of Bokang Bailing Hydro Electric Project (330 MW), Uttarakhand.
  • Power Potential and E&M studies of power houses proposed under Damanganga-pinjal link project assigned by National Water Development Agency (NWDA).
Other Assignments Details:
  • Planning, Designing and Engineering solution for the hill stabilization problem of VarunavatParvat in Uttarkashi, Uttarakhand for GoUK as well as supervision of work.
  • THDCIL is involved in providing consultancy service to state PWD of Uttarakhand in Planning, Designing & Engineering measures including assistance & technical monitoring during execution stage for the stabilization of 20 chronic slide zones on various road locations in parts of Uttarakhand (Annexure-III).Successfully executed about 14 locations so far.
  • THDCIL is involved in “planning, designing and engineering measures for stabilization of numerous (35nos.) vulnerable zones between Katra and Shri Mata VaishnoDeviji Shrine”.
  • THDCIL is involved in engineering consultancy for underground parking at Mussoorie and subsequently submitted Pre – Feasibility Report of Underground Parking Place for 100 vehicles in Mussoorie.
  • THDCIL is involved in providing consultancy service to state PWD of Uttarakhand in Planning, Designing & Engineering measures including assistance & technical monitoring during execution stage for stabilising the chronic slip zone on slope adjoining Rajbhawan, Nainital for immediate measures (Phase-I), and comprehensive scheme (Phase-II).
  • Association of THDCIL with Shrine Board of Shri Amarnathji, Srinagar, J&K as technical consultants. Prepared Detailed Project Report for protection/ treatment and slope stabilization works near Holy Cave for Shri Amarnathji Shrine Board, Srinagar, J&K.
  • THDCIL is involved in engineering consultancy for vetting of the slope stabilization DPRs for 5 locations submitted by M/s WAPCOS to the Government of Uttarakhand- Some of them have already been executed by PWD successfully.
  • Prepared Detailed Project Report (DPR) for Grid connected Solar Power Project of 20 MW capacity at Cheetakhera in District :Nimach (M.P) .
  • Power Potential and E&M Studies of Hydro Power Project under Damanganga – Pinjal Link Project for Bhugad Dam and Reservoir.
  • Power Potential and E&M Studies of Hydro Power Project under Damanganga – Pinjal Link Project for Khargihill Dam and Reservoir.
  • Design and Engineering solution for the hill stabilization problem of Tambakhani chute treatment work in Uttarkashi, Uttarakhand for GoUK.
  • Preparation of report on Indravati River Basin based on an Integrated Basin concept for Chhattisgarh State Power Generation Co. Ltd.(CSPGCL)
  • Power Potential and E&M Studies for 06 Nos. Hydel Projects proposed under Par – Tapi – Narmada Link Project for preparation of Detailed Project Report (DPR) developed by National Water Development Agency (Award of Consultancy Work is in process
  • THDCIL had organized 5 days “Comprehensive Training Programme on Hydro Power Development” for NTPC Ltd. Officials).